EP Curves

Ultima actualizacion: hace 12 min

Exceedance Probability Curves — Cartera completa

1,847 activos · Valor asegurado total: €4.2B
1.0 0.50 0.10 0.050 0.010 0.005 0.002 0.001 0 20 40 60 80 100 120 140 160 180 200 Perdida (€M) Probabilidad de excedencia 1/100 1/200 1/475 OEP 200: €47.2M AEP 200: €31.8M OEP 475: €94.8M AEP 475: €72.1M
OEP (Occurrence)
AEP (Aggregate)

Perdidas por periodo de retorno

TIV: €4.2B
Periodo retorno OEP (€M) AEP (€M) OEP (% TIV) AEP (% TIV)
10 anos 8.4 5.2 0.20% 0.12%
25 anos 18.6 12.1 0.44% 0.29%
50 anos 29.3 20.7 0.70% 0.49%
100 anos 38.5 26.4 0.92% 0.63%
200 anos 47.2 31.8 1.12% 0.76%
250 anos 52.1 35.6 1.24% 0.85%
475 anos 72.4 50.8 1.72% 1.21%
1,000 anos 94.8 72.1 2.26% 1.72%
2,500 anos 132.6 98.4 3.16% 2.34%

Contribucion por tipo de activo al PML 200

€47.2M
PML 200 €47.2M
Edificios comerciales 38% €17.9M
Edificios residenciales 22% €10.4M
Plantas industriales 18% €8.5M
Puentes 12% €5.7M
Presas 6% €2.8M
Otros 4% €1.9M